• Team
  • AUVs
    • Oogway
    • Crush
    • Past AUVs
    • Technical Design Reports
  • Blog
  • Gallery
  • Outreach
  • Sponsors
  • Contact
  • Wiki
  • Instagram
  • GitHub
Skip to content
Duke Robotics Club
  • Team
  • AUVs
    • Oogway
    • Crush
    • Past AUVs
    • Technical Design Reports
  • Blog
  • Gallery
  • Outreach
  • Sponsors
  • Contact
  • Wiki
  • Instagram
  • GitHub

Author: Nathanael Ren

An ode of appreciation

by Nathanael RenPoetryPosted on November 1, 2025November 2, 2025No Comments

Hung, resident GOAT Ran the pool test, kept our streak Lots of nostalgia A haiku by Nathanael Ren on 1 November 2025.

An ode of appreciation

by Nathanael RenPoetryPosted on October 26, 2025November 2, 2025One Comment

Max Lin the legend Came to the pool test today Graced by his presence A haiku by Nathanael Ren on 26 Oct. 2025

Pool Test 25 Oct. 2025

by Nathanael RenPool Test UpdatesPosted on October 26, 2025October 26, 2025No Comments

Officially past the halfway point of the fall semester, we’re finally starting to get into the groove of things. Today’s pool test went quite smoothly despite some hiccups at the start. Please also see the ode of appreciation for today. Gross Hall Issues Back in the lab, before we started pool testing, we had some …

Read more “Pool Test 25 Oct. 2025”

Pool Test 19 Oct. 2025

by Nathanael RenPool Test UpdatesPosted on October 20, 2025No Comments

After 5 weeks out of service, we were ecstatic to get back into the pool. Thankfully, it was not 6-7 weeks — that would have caused major timeline delays. Goals Our goals for this week’s pool test was to calibrate Oogway’s Gyro after returning from California, collect sonar data, and demo the robot. Setup and …

Read more “Pool Test 19 Oct. 2025”

CS Updates: 6-7 Meetings Later

by Nathanael RenCS UpdatesPosted on October 19, 2025October 26, 2025No Comments

In pursuit of making our award-winning team video 28 Meetings Later, I will report on the progress CS has made in 6-7 meetings. Robot Issues Coming back from comp, we noticed approximately 6-7 issues with ‘ole reliable Oogway (and a few with Crush too). Here’s a list of some of them that we resolved: But …

Read more “CS Updates: 6-7 Meetings Later”

Pool Test Update 13 Sept. 2025

by Nathanael RenPool Test UpdatesPosted on September 13, 2025September 13, 2025One Comment

Ah, the first pool test of the year. In September this time! Vedarsh would be proud. Workflow Problems It’s almost never smooth, but this time we wasted quite a bit of time getting setup that we must eliminate in the future. Here’s an analysis of our timeline: 1:15pm: We begin moving everything over to the …

Read more “Pool Test Update 13 Sept. 2025”

Inspiro Theme by WPZOOM

Copyright © 2025 Duke Robotics Club. All Rights Reserved.