Pool Test 06/13/2026 and 06/14/2026
Goals: 1. Get Crush into the water and tune static power and begin PID tuning. 2. Get Oogway driving and collect Acoustics data 06/13/2026 This day was dedicated to getting Crush into the pool and driving. Back at the Foundry, we made sure that our previous SSH issues were resolved and that we could connect …
