Pool Test 02/16/2025

We first adjusted Oogway’s buoyancy. With the two large buoyancy blocks attached behind the torpedo launcher, along with adjustments made in the pool, we were able to make Oogway’s buoyancy level. In this process, we noticed that the spacers for the buoyancy shafts are too small and need to be reprinted with a larger diameter. …

Fall 2024 Semester Recap and Spring 2025 Plans

As we conclude the Fall 2024 semester, the Duke Robotics Club reflects proudly on the progress we’ve made. This semester was filled with milestones, from transitioning our systems to ROS2 and advancing the design of our new minibot to redesigning electrical systems and conducting essential pool tests. Alongside these technical accomplishments, we onboarded the largest …

Pool Test 04/19/24

Before the test: Last night, Philip finished wiring the Ping1D. Today morning, we discovered that the epoxy applied to the battery connector had gotten into the connection, causing the connector to be very tightly connected with the wall power connector. We couldn’t separate them with brute force, so Philip cut off part of the insulation. …